A 10×10 (100 sqft) deck costs $12,760–$17,180 installed in 2026, depending on material and state. The lower end is pressure-treated pine in an average-labor state; the upper end is premium hardwood in a high-labor metro. Most homeowners picking a mid-tier composite land at $15,236.
What a 10×10 deck fits
At 100 square feet, a 10×10 deck comfortably holds a 2–4 person conversation area, small grill, and two chairs — common for second-story walkouts and starter decks.
For perspective: a 4-person round dining table needs about 80 sqft clear space. A standard outdoor couch plus coffee table needs 50–70 sqft. A built-in grill station needs 20–30 sqft plus clearance. Add 6 feet of circulation paths on active sides.
Cost by material — 10×10 deck (US average)
Mid-height (3–5 ft) build, composite balusters, one stair run, permit, 8% contingency. Baseline uses a national average labor rate.
Pressure-Treated Pine
15–20 yrs · Stain every 2–3 yrs
$128/sqft
$12,760
Cedar / Redwood
20–25 yrs · Seal every 2–3 yrs
$136/sqft
$13,611
Composite (Trex, TimberTech)
25–30 yrs · Rinse yearly
$152/sqft
$15,236
PVC / Cellular
30+ yrs · Rinse yearly
$164/sqft
$16,369
Ipe / Cumaru Hardwood
40+ yrs · Oil annually (optional)
$172/sqft
$17,180
10×10 composite deck cost by state
Same 100 sqft composite build, state-by-state. Metro labor can shift these another ±5–15%.
A 10×10 (100 sqft) deck costs $12,760–$17,180 installed in 2026. Pressure-treated pine is the cheapest at ~$128/sqft; composite (Trex, TimberTech) runs ~$152/sqft; premium hardwood (ipe) runs up to ~$172/sqft. Labor is 40–55% of the total.
Can I build a 10×10 deck myself?+
Yes — a 10×10 deck is within reach for an experienced DIYer over 2–3 weekends, especially in pressure-treated pine. Expect to save 40–55% on labor if you're capable; add 10–15% to material budget for wasted cuts and mistakes.
Do I need a permit for a 10×10 deck?+
Yes in nearly all US jurisdictions. Decks over 30 inches off the ground or attached to the house require a building permit and at least a footing and final inspection. Permit costs typically run $100–$500; a 100 sqft deck lands in the middle of that range.
How long does a 10×10 deck take to build?+
1–2 weeks of active build time for a crew of 2–3 once permits are approved. Permit approval itself adds 2–6 weeks upfront. Composite and PVC installs run slightly faster than wood; multi-level or wraparound designs add another 1–2 weeks.
What shape should a 10×10 deck be?+
Rectangle is the cheapest and fastest to build. L-shape adds 10–15% cost but wraps around corners well. For footprints where 10×10 is the bounding box, check what fits inside — an L-shape or wraparound at a 10×10 envelope will have less actual deck surface than a solid 100 sqft rectangle.
Price your own 10×10 deck
Use the calculator to adjust material, shape, height, railing, and features for your state.